Des Moines Wood Floors Engineered plank is the right answer over a slab, over an Iowa basement and under radiant heat, and its limit is the thickness of the wear layer on top. Free in-home estimate, usually within two working days.

An engineered board is a real wood wear layer over a plywood or HDF core with the plies running at right angles. That construction is what stops it cupping and gapping the way a solid board does when humidity swings.
Wear layer is the number that decides whether it is a lifetime floor. Two millimetres cannot be sanded at all. Three millimetres takes one light sand. Four to six millimetres behaves much like a solid floor and can be refinished two or three times.
It goes down glued to the slab with a moisture-control urethane adhesive, or floated over an underlay, or nailed if there is a wood subfloor and the board is thick enough to take a cleat.
On a basement slab we test moisture with a calcium chloride test or an in-slab probe before choosing the adhesive. A slab that reads high needs a membrane or a moisture-blocking adhesive, and skipping that step is how a glued floor releases in patches two summers later.
Floated floors need a perimeter expansion gap at every wall and every fixed object, hidden by the base shoe. A floating floor pinned by a door casing or a kitchen island will buckle in the middle of the room.
Engineered labour is close to solid for a glue-down and a little less for a float. The wear layer thickness moves the material price more than the species does, and a thin wear layer on a cheap board is not a saving if it cannot be refinished.
What we get called out to is a floated engineered floor over a basement with no expansion gap, or a glue-down straight onto a slab with no moisture test. Both look perfect for a year.
We cover Des Moines, the western suburbs, the Ankeny corridor and the older neighbourhoods inside the city, including and 18 more areas.
Yes. That is exactly what it is for. Test the slab moisture first and pick the adhesive from that reading.
It is on the spec sheet in millimetres. Under 2mm treat it as a floor you will replace rather than refinish.
Not over a slab or a basement, where it is the only construction that works. Over a heated upstairs, solid lasts longer.
Tell us what you need. We answer the same day, the free estimate is on site, and nobody chases you afterwards.
Call and we will come out, measure, and leave you a written quote. There is no charge for the visit and no obligation afterwards.