Des Moines Wood Floors What can go down depends on what is under it: nailed solid over a conditioned crawlspace or an upstairs, engineered over anything touching a Des Moines basement. Free in-home estimate, usually within two working days.

Solid 3/4 inch tongue and groove is nailed through the tongue into a wood subfloor with 16 gauge cleats, roughly every eight inches and closer at the ends of each board. It lasts a century and can be sanded many times.
Over a slab or above an unheated basement, solid wood is the wrong construction and no amount of good carpentry saves it. Engineered plank goes there instead, either glued or floated, because its cross-laminated core does not move across the grain the way a solid board does.
Over a conditioned upstairs, solid wood nailed down is the right answer and lasts a century. Over an unconditioned basement or a slab, it is the wrong answer, and no amount of good carpentry fixes it. Engineered goes down there instead. That is not a downgrade. It is the only construction that survives an Iowa basement's humidity swing.
The material comes into the house and sits in the room it will live in, opened, for five to seven days before a board goes down. Skipping it means the boards settle to your house's width after they are already nailed down, instead of before.
We take a moisture reading of the boards and of the subfloor and write both on the invoice. The number that matters is the difference between them: more than 4 percent apart on a solid floor and the boards will move after they are fastened.
Layout starts from the longest sightline, usually a hallway, and runs perpendicular to the joists. Rooms get racked out ahead so no two end joints land within six inches of each other, which is what stops the eye seeing a staircase pattern in the finished floor.
Installation is quoted per square foot for labour with the material separate, because material is where the range really lives. Site-finished solid means a sanding job afterwards as well, so the honest comparison against prefinished includes that.
The Iowa specific failure is a floor laid in an unheated house in winter. Boards go down at the moisture content of a cold empty house, the furnace comes on, and by March there are gaps at every seam that never fully close again.
We cover Des Moines, the western suburbs, the Ankeny corridor and the older neighbourhoods inside the city, including and 18 more areas.
Upstairs and over a heated basement, solid. Directly over a slab, over an unconditioned basement, or with radiant heat, engineered.
Five to seven days in the room where it will be installed, with the heating or cooling running as it normally would.
Prefinished is faster and has a tougher factory coating with a bevel at every board. Site finished gives a flat surface with no bevels and can be refinished more times.
Tell us what you need. We answer the same day, the free estimate is on site, and nobody chases you afterwards.
Call and we will come out, measure, and leave you a written quote. There is no charge for the visit and no obligation afterwards.